Brooklyn Kings Plaza Mall case study

Maintaining Operational Reliability and Resiliency at Brooklyn's Kings Plaza Mall

Brooklyn improves commercial operations excellence at Kings Plaza Mall's central utility and CHP plant

The combined heat and power (CHP) plant that powers Kings Plaza Mall in Brooklyn, NY operates as an island without connection to the electric grid.

Reliability, resiliency, efficiency, and cost-effectiveness are of the utmost importance to its operations and financial performance.

As the operations and maintenance (O&M) administrator for the CHP plant, Veolia is solely responsible for delivering all of the electric and thermal power requirements of the facility.

 

Download our case study to learn more about how Veolia:

  • Increased utility performance
  • Reduced downtime
  • Provided ongoing operational cost savings
  • Supported with up-to-date metering and billing services