Puerto Rico energy master planning

Puerto Rico-Based Manufacturing Plant Reduces Electric Costs by 40%

Energy master planning and analysis bring resilient power strategies to a high tech manufacturing facility

A leading medical device company retained Veolia’s energy consulting group to improve energy reliability and assess on-site power generation options for its manufacturing facility in Juana Díaz, Puerto Rico.

This manufacturer’s facility was served by unreliable and expensive energy resources. The Owner ran the risk of unplanned interruptions that could result in damage to expensive process equipment or lost revenue from production downtime.

High power costs coupled with energy-intensive operations were impacting plant profitability and the manufacturer’s competitive position.

 

Download our case study to learn more about how the following helped determine the final solution:

  • Identified key energy needs
  • Quantified regulatory and environmental concerns, reliability and operational impacts
  • Developed a total energy requirements model
  • Technical and financial performance analysis
  • Established multiple criteria analysis to rank alternative technologies based on a multitude of factors